Case Study

Columbia Milling and Overlay – Multi Year

  • Service Page Icon

The city anticipated allocating $2.5 million dollars for the asphalt mill and overlay contract annually. The evaluation and award process is based on several factors including cost, experience, reliability, expertise of personnel, and method of performance. The project mainly consisted of 1.5” milling, full width, or edge milling, followed by a 1.5” BP1 asphalt overlay. All materials and placement efforts were in accordance with MoDOT standard specifications.

Collaborative Innovation

Capital scheduled work in conjunction with other City of Columbia contractors who are responsible for concrete patching on the streets and reconstructing existing ADA sidewalk ramps to ensure compliance. Capital was responsible for all traffic control associated with the project and temporary striping. This project took place throughout several highly visited areas in the City, including Broadway, Hitt Street, and Conley Road Corridor.

Want to learn more about this project?

Contact Us

More Case Studies

Agricultural Vehicle

Outlaw – Wind

  • construction
DJI_20230828073411_0143_D

Fixing Access to Rural Missouri (FARM) Bridge Program

  • construction
Northwest Missouri Design Build Bridge Bundle

Northwest Missouri Design-Build Bridge Bundle

  • construction